The ARS403 Hydraulic Cable Puller or cable handling winch, is suitable to string one rope.  The bull wheel grooves are made of wear proof thermally treated steel. 

  • Used for overhead and underground cable pulling
  • Negative self-acting hydraulic brake
  • Hydraulic dynamometer with set-point and automatic control of max. pull
  • Hydraulic oil cooling system
  • Control instruments for hydraulic system and diesel engine
  • Rigid axle for towing at max speed of 30km/hr
  • Built-in reel winder with automatic level wind, suitable for standard reel BOF010 and BOF020 (AXR001 included)
  • Electronic pull and speed recorder kit (instrument not included)
  • Pull pre-setting system
  • Mechanical front stabiliser
  • Grounding connection point
  • Hydraulic Transmission
  • Closed hydraulic circuit for stepless speed variation in both rotating directions.

PERFORMANCE 

  • Max pull 35kN
  • Max speed at pull 1.2km/hr 
  • Max speed 3.6km/hr
  • Pull at max speed 12kN
  • Engine Output 25kW
  • Bull wheel Ø 325mm
  • Rope Ø 13mm

OPTIONS

  • Standard Road Trailer
  • Mine Spec Road Trailer
  • Site Trailer
  • Pull Recorder DLR300
  • 13mm Steel Wire Anti-twist rope
  • 12.7mm Dyneema 12 strand rope

Hire Also Available from TEN Hire

Tension Stringing with Tesmec Cable Hauling Equipment

The first goal when installing - or replacing in case of re-conductoring - an overhead single or bundled conductor(s) is to prevent its damage during stringing operations.

Tension stringing and power lines installation technology allows you to install the conductor under controlled mechanical tension, preventing it from touching the ground (or any infrastructure on the line path), and minimizing the impact on the line path.

Re-conductoring stringing operations, with energized line (possible only for lines with more than 2 circuits - one will be interrupted), are becoming more frequent and vitally important all around the world. Live line operations are the most efficient way to:
- replace old conductors when close to the end of their life,
- increase the capacity of an existing line, by replacing the ordinary conductors with the new generation ones like HTLS (High Temperature Low Sag).

The possibility of tension stringing all the conductors of a phase simultaneously is a great achievement for installation efficiency. Multiple stringing can perform up to eight conductor simultaneously, using multiple conductor machines or modular electronically synchronized machines.
The high precision and reliability of the tension control system, independent for every conductor, deliver the highest installation quality.