15kN Hydraulic Puller, Tesmec

15kN Hydraulic Puller, Tesmec


Code: ARS200
Brand: Tesmec
Product Details
Puller Hydraulic Tesmec 13kW petrol, air cool, 12v15kN at 0.7km/h


  • Used for overhead stringing and underground cable hauling
  • Negative self acting hydraulic brake
  • Bull wheels made of wear proof thermally and chemically treated steel
  • Hydraulic dynamometer with set point and automatic control of maximum pull
  • Built in reel winder with automatic level wind and special reel for 500m of 8mm Ø Rope
  • Closed hydraulic circuit for stepless speed variation in both rotating directions
  • Single rope stringing 
  • Cable guide pivot pulley suitable for work in any underground situation
  • 12VDC electrical system
  • Machine Weight 500kg excluding fluids (Puller Only)

PERFORMANCE

  • Max pull 15kN
  • Max speed at pull 0.7km/hr
  • Max speed 3.6km/hr
  • Pull at max speed 4kN
  • Engine Output 13kW
  • Bull wheel Ø 200mm
  • Rope Ø 8mm

OPTIONS

  • Standard Road Trailer
  • Skid
  • 8mm Braided rope

Hire Also Available from TEN Hire

Tension Stringing with Tesmec Cable Hauling Equipment

The first goal when installing - or replacing in case of re-conductoring - an overhead single or bundled conductor(s) is to prevent its damage during stringing operations.

Tension stringing and power lines installation technology allows you to install the conductor under controlled mechanical tension, preventing it from touching the ground (or any infrastructure on the line path), and minimizing the impact on the line path.

Re-conductoring stringing operations, with energized line (possible only for lines with more than 2 circuits - one will be interrupted), are becoming more frequent and vitally important all around the world. Live line operations are the most efficient way to:
- replace old conductors when close to the end of their life,
- increase the capacity of an existing line, by replacing the ordinary conductors with the new generation ones like HTLS (High Temperature Low Sag).

The possibility of tension stringing all the conductors of a phase simultaneously is a great achievement for installation efficiency. Multiple stringing can perform up to eight conductor simultaneously, using multiple conductor machines or modular electronically synchronized machines.
The high precision and reliability of the tension control system, independent for every conductor, deliver the highest installation quality.